About company

We Create
and Turn Into Reality

MINE EXTRACTION LLC is a private company planning to extract chrome ores from the Kapitanka Project in the Kirovohrad region (Ukraine). The company received a Special Permit for Subsoil use from the State Service of Geology and Subsoil of Ukraine (Gosgeolnedr), dated September 25, 2019 No. 6378 and has a detailed plan for the effective development of this Project.

read more


We care about the stable existence and development of our Company and therefore we use modern approaches and technologies. The working team of the Company consists of specialists with extensive modern professional experience.

The MINE EXTRACTION company is open for long-term partnerships on a permanent and responsible basis in the exploration and production of ores of the Kapitanka Project. Our team invites you to take part in its development.

Our achievements and immediate plans

In 2019, the specialists of the MINE EXTRACTION Company analyzed the available geological materials, performed a preliminary geological and economic assessment with the calculation of the reserves of chrome ores of categories C1 and C2 of the Kapitanka Project.

These reserves, according to the current legislation, were approved by the State Commission of Ukraine on Mineral Resources (SCR). We plan to develop the Project using the underground method using modern technologies and equipment, with backfilling of the abandoned area. This method is the most progressive, since it ensures the minimum use of agricultural land, as well as efficient and environmentally friendly mining of the minerals. The conclusions obtained by our specialists indicate the economic efficiency of the planned development of the Project (SCR protocol dated 02.04.2019 No. 4744).

The next important step of the Company was the creation of a database, using Micromine software and the construction of a 3D model of the Kapitanka Project with a grade cut-off of Cr2O3 in chromium ores 4%.

In 2020, after receiving the above-mentioned special permission from Gosgeolnedr, we drew up and approved a project for a detailed geological and economic assessment of the Central and Southern parts of the Project, according to which it is planned to carry out surveying and drilling operations with appropriate study and testing of core material. The most important component of the planned work will be processing and technological studies with the aim of selecting and testing the process flow sheet for the enrichment of chrome ores to obtain a complex (Cr, Ni, Co, Fe, possibly Au, Pt, Pd) commodity product. We have already reached an agreement to carry out these tests at the well-known German company ANZAPLAN. The results of these studies will make it possible to assess the Kapitanka Project correctly – according to the requirements of the classification NI 43-101 (Canadian National Instrument) or the JORC Code.

read less
BRIEF

MINE EXTRACTION LLC

Our team offers you the efficient development of the Kapitanka Project. We are open to long-term partnerships on a sustainable and responsible basis for the exploration and production of ores at the Kapitanka Project.

We aim to use the world’s best technology and solutions that are the most environmentally effective.

The development of mining in the region is a huge contribution to social and economic development for the region and the local population.

ADVANTAGES

WHAT IS KAPITANKA PROJECT

0
Cr2O3 Grade, %
0
Ore Tonnage, ‘000 t
0
Cr2O3 ‘000 t
0
Concentrate grade Cr2O3 , %
TEAM

our Amazing team

Exploration and modeling of Kapitanka Project is carried out by highly skilled specialists who have great experience both in Ukraine and abroad Mining. Laboratory and technological research is performed in leading European laboratories.

Evgeniya Vishnevska

РHD IN GEOLOGY
About 20 years in geology. Eugenia has extensive experience in petrological studies, especially of copper-nickel and titanium-vanadium objects in Ukraine, has been involved in the forecasting and

read more
prospecting of uranium deposits. Eugenia also specializes in geological interpretation and modelling.
read less

Nina Safronova

GEOLOGIST, MAGISTER IN GEOPHYSICS
More than 15 years in geology. Has experience in geophysical areal studies. She is involved in works related to analysis, statistical data processing and compilation of complex

read more
databases. Specializes in wireframe and block modeling of ore deposits.
read less

SVITLANA SERGEEVA

METROLOGIST, SPECIALIST IN PROCESS CHEMISTRY
Svetlana has more than 30 years of experience in the geological industry. In addition, Svetlana was working in the field of information security for over 10 years.

read more
Cooperates with domestic and foreign specialists in support of laboratory work. He is implementing a quality assurance program for assay and laboratory work (QA / QC) in the company, carries out metrological examinations of geological documentation.
read less

Let’s Get in Touch

Contact details

Phone: +38 (068) 779-85-29
E-mail: info@mineextraction.com
Address:Office 11, 22A, Borychiv Tik Street, Kyiv, 04070

    Geological support is provided by LLC Geological Service Company GSC

    WE WILL PROVIDE THE MINING AT THE KAPITANKA PROJECT IN AN EFFECTIVE, ECONOMICAL AND ENVIRONMENTALLY FRIENDLY WAY!