Resources

In 2019, Mine Extraction LLC conducted a preliminary geological and economic assessment of the Kapitanka chrome project. As a result, reserves of categories C1 and C2 were approved in the State Commission of Ukraine on Mineral Resources. The preliminary geological-economic assessment report data indicate the economic efficiency of developing chrome reserves, as well as high nickel and cobalt concentrations in the ore of the Kapitanka Project.

Category [Site] Tonnage, th.tons Grade Cr2O3, % Cr2O3, th.tons
C1 [Central] 384.0 31.4 120.7
C1 [South] 2582.1 12.87 332.2
Total: C1 2966.1 15.95 452.9
C2 [South] 521.4 22.36 116.6
Total: C1+C2 3487.5 16.85 569.5

Wireframe model

Preliminary Wireframe 3D model was created based on geological and analytical information in Micromine Software – Cr2O3 by cut-off 4%.

WE WILL PROVIDE THE MINING AT THE KAPITANKA PROJECT IN AN EFFECTIVE, ECONOMICAL AND ENVIRONMENTALLY FRIENDLY WAY!