In 2019, Mine Extraction LLC conducted a preliminary geological and economic assessment of the Kapitanka chrome project. As a result, reserves of categories C1 and C2 were approved in the State Commission of Ukraine on Mineral Resources. The preliminary geological-economic assessment report data indicate the economic efficiency of developing chrome reserves, as well as high nickel and cobalt concentrations in the ore of the Kapitanka Project.

Category [Site] Tonnage, th.tons Grade Cr2O3, % Cr2O3, th.tons
C1 [Central] 384.0 31.4 120.7
C1 [South] 2582.1 12.87 332.2
Total: C1 2966.1 15.95 452.9
C2 [South] 521.4 22.36 116.6
Total: C1+C2 3487.5 16.85 569.5

Models

Preliminary 3D model of the Kapitanka Project was created based on geological and analytical information in Micromine Software, and Cr2O3, Ni, Co and Fe resources were calculated.

WE WILL PROVIDE THE MINING AT THE KAPITANKA PROJECT IN AN EFFECTIVE, ECONOMICAL AND ENVIRONMENTALLY FRIENDLY WAY!