In the fourth quarter of 2021 from 15 to 26 November, officials of state supervision (control) of the State Service of Geology and Subsoil of Ukraine conducted a scheduled inspection of compliance with legislation in the field of geological study and rational use of subsoil «Mine Extraction».
Preliminary 3D model
In the third quarter of 2021, a preliminary 3D model of the Kapitanka Project was built based on the database, and Cr2O3, Ni, Co and Fe resources were calculated https://mineextraction.com/resources-and-modeling/
MINE EXTRACTION LLC has joined the network of the European Raw Materials Alliance – ERMA
The European Raw Materials Alliance ( https://erma.eu/) was established in 2020 as part of the EU Critical Raw Materials Action Plan and the publication of the EU Critical Raw Materials List 2020. The main goal of ERMA is to reduce the dependence of European consumers of mineral resources on third...
In the second quarter of 2021, the Drilling Program for a detailed geological and economic assessment of the Kapitanka Project was designed
Exploration Program – Kapitanka Project (mineextraction.com)
Mine Extraction LLC received form 3-gr for carrying out work on a detailed geological and economic assessment, registration number У-21-83/1 of March 31, 2021.
Negotiations with ANZAPLAN were held in March 2021. A proposal for Metallurgical test work of chromium ores of the Kapitanka Project using a combined test flow chart, which includes optical preliminary sorting and crushing of the ore to 100 microns.
Bochevar R. Formation accessory and creation stages of ore of ultrabasitemassives of the Kapitanivske ore field // Scientific proceedings of the Institute of Geological Sciences of NAS of Ukraine. – № 4. – 2011 – С. 28-34.
Creation stages of ore of ultrabasitemassives of the Kapitanivske ore field were extracted: magmatic, metamorphic, hydrothermal, supergene. Mineral associations creation stages of ore were described. Possible types of ores of investigation massives were determined. Formation accessory of ultrabasitemassives of the Kapitanivske ore field is considered. Keywords: ultrabasite massif, ore formation,...
In the fourth quater of 2020, a 3D model of the Kapitanka Project was built based on the database, with a cut-off grade Cr 2 O3 4 %.
Resources and Modeling – Kapitanka Project (mineextraction.com)
In the third quarter of 2020, a Project of detailed geological and economic assessment of the Central and Southern parts of the Kapitanka Project in the Kirovohrad region was written.
Pavliuk O., Kvasnytsya V., Kysliuk V., Pavliuk V. Native Platinum in Rocks of the Chemerpil’ska Structure (the Middle Bug Area) // Mineralogical Journal. – № 1. -32. – 2010. – C. 50-56.
Holovanivs’ka sutural zone attracts people attention of researchers the prospect region for elements of platinum group exploration for a long time. Starting from the 1970’s in the course of geological survey platinum anoma lies were explored in the North-Ternuvats’ka, Kapitans’ka, Lypovenkivs’ka and Chemerpils’ka areas by different geological organizations. Maximal platinum...